Run an efficient job site
Bermingham Leads have been designed to increase the productivity of the pile driving operation. This is accomplished by minimizing the movement of the crane, and by decreasing the time spent placing the pile under the hammer and spotting of the pile. On a typical project, the actual productive driving time may be increased from an average of 50% of the work day to 75% or more.
At the “BIG DIG” in Boston, Nicholson Construction reported an increase in production from 5 insertions per day with a custom European piling rig to 12 insertions per day with a Bermingham Vertical Travel Lead on a Manitowoc M-250.